WSSU Renovation: HVAC Mechanical System Pipe Welding


Name: Chilled Water Pumping Station
Description: Before Installation
Name: Chilled Water Pumping Station
Description: 4" Suctions From Main Lines To Pumps
Name: Chilled Water Pumping Station
Description: Dual Pumps From Suction Side To Supply Side
Name: Chilled Water Pumping Station
Description: Side Veiw Of Pump Arrangment
Name: Chilled Water Pumping Station
Description: Pumping Station Completed And Insulated
Name: Chilled Water Pumping Station
Description: Pumping Station Completed And Insulated
Name: Chilled And Hot Water Lines
Description: Ceiling Area Before Installation
Name: Chilled And Hot Water Lines
Description: Lines Hung And Partially Insulated
Name: Chilled And Hot Water Lines
Description: Lines Were Run This Way Through 3 Floors On Both Ends Of The Building
Name: Chilled And Hot Water Lines
Description: Crawl Space Wall Before Pipe Runs
Name: Chilled And Hot Water Lines
Description: All Lines Offset With Drains To Meet Required Height
Name: Chilled And Hot Water Lines
Description: Side View Partially Insulated