| Name: Mechanical Room |
|
Description: Before Installation
|
|
|
|
| Name: Chilled And Hot Water Lines |
|
Description: Lines Coming Through Wall After Partial Installation Joining Into One
|
|
|
|
| Name: Chilled And Hot Water Lines |
|
Description: Lines Mostly Completed At Joining Point
|
|
|
|
| Name: Chilled And Hot Water Lines |
|
Description: Showing Tees, Reductions, Threading,And Air Bleeds
|
|
|
|
| Name: Chilled And Hot Water Lines |
|
Description: Lines Completed And Insulated
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Low Pressure Connection To Heat Exchanger Before Installation
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: 3" Tee And Drain Section Fabricated And Installed
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Section Completed With All Valves And Controles Installed
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Supply End Veiw Of Completed Section
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Completed Delievery End
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Close-Up Of Tee On Delievery End
|
|
|
|
| Name: Low Pressure Steam Control Section |
|
Description: Section Completed, Tested, And Insulated
|
|
|
|